LONGKE Adds Injection Moulding Capacity Through a Guangdong Partner
Nine moulded product families, 25 to 650 tonnes and a drawing-first workflow now sit behind one quotation for component buyers.

GUANGZHOU, 12 November 2026 — LONGKE INDUSTRIAL has added volume injection moulding to its quotation scope through a dedicated partner plant in Guangdong with production history across nine product families. The programme covers clamping forces from 25 to 650 tonnes and runs from drawing review, through first-article approval, to inspected and export-packed parts.
For a buyer, the practical difference is the number of counterparties. One drawing now produces one quotation covering tooling, moulding, secondary operations and packing, instead of a moulder, a finisher and a forwarder coordinated separately.
Nine product families already in production
The plant's record is in components rather than branded consumer goods, which is the distinction that matters to industrial buyers: parts made to somebody else's drawing, to somebody else's tolerance.
- Appliance components — internal brackets, mounts and structural parts for white goods.
- Appliance housings — smoke detector and speaker shells, handheld fan bodies.
- Industrial components — T-seals, blanking plugs, tube inserts, square and round end caps.
- Machinery parts — gears and wear parts for mechanical assemblies.
- Household goods — ice cube trays, refrigerator organisers, pill boxes, storage boxes with runners.
- Pet products — smart feeders and waterers, vacuum food bins, auto-refill units.
- Profile and custom-shaped parts — non-standard sections where no catalogue part fits.
- Outdoor equipment — torches, rechargeable lamps, tyre inflators.
The pet range is the clearest evidence of assembly capability. A smart feeder is a moulded housing, a food auger, a control board and a motor, assembled and tested — not a single shot from one tool. Buyers who need the moulding plus the assembly in one place should read that range as the relevant reference, not the ice cube tray.
From drawing to first article
Every programme runs the same five stages, and each stage leaves the buyer with a document rather than a promise.
- Drawing review. Wall sections, draft, undercuts, parting line and gate position are checked against the tool before anything is quoted. An undercut that needs a slider is a cost, and it is better to see it here than after the steel is cut.
- DFM report. Where a drawing cannot be moulded as drawn — a wall that will sink, a boss that will not eject, a tolerance the process cannot hold — the change is proposed with its cost and timing consequence attached, so the decision is commercial rather than technical.
- Tooling quotation. Cavity count, steel grade, runner type and expected tool life are stated explicitly. A tool quoted without a stated cavity count is not a quotation.
- T1 samples and first article inspection. Critical dimensions are measured against the drawing and reported numerically. Photographs are not dimensional evidence.
- Production and shipment. In-process inspection, batch traceability and export packing, with sample and batch lead times confirmed in writing before the order is placed.
| Stage | What the buyer receives |
|---|---|
| Drawing review | Marked-up drawing with tooling notes and risk points |
| DFM | Change list with cost and timing consequence per change |
| Tooling quote | Cavity count, steel grade, runner type, expected tool life |
| T1 / FAI | Dimensional report against the drawing |
| Production | Batch record and inspection report shipped with the goods |
Where certification sits — and why buyers get this wrong
When a moulder supplies a component that goes into your finished product, the CE marking, the UL listing and the UKCA mark belong to you, the brand owner. They are declarations about a complete product. No component supplier can hold them on your behalf, and a supplier who says otherwise is describing somebody else's certificate.
What the moulder owes you sits upstream of that: material grade, substance declarations under REACH and RoHS, flammability data such as UL 94, and dimensional evidence against the drawing. Buyers who understand the split stop asking a Chinese moulder for "CE" and start asking for a material declaration — which is faster to obtain, cheaper to verify, and actually usable in their own technical file.
What we quote, and what we decline
We quote what the tooling can hold. When a drawing specifies a tolerance the process cannot repeat — a flatness callout across a warping part, a wall section that will not fill, a colour match against a screen — the answer is a redesign proposal, not a price with a caveat buried in the terms. A quotation that assumes the part will work is the most expensive kind.
Questions buyers ask before the first tool is cut
Do you hold CE or UL for the moulded parts?
No, and neither does any component moulder. Those marks apply to finished products and sit with the brand owner. What is supplied is material and substance documentation — grade, REACH SVHC status, RoHS status, UL 94 rating — plus a dimensional report against your drawing.
What wall thickness should a housing drawing specify?
For ABS or polycarbonate enclosures, 1.8 mm to 2.5 mm is a practical starting range. Below 1.2 mm the tool needs higher injection pressure and more rigid steel; above 3 mm, cycle time and sink risk climb together. Uniform nominal wall matters more than the number itself.
Can you match a part we already buy elsewhere?
Yes, given a sample or a drawing with tolerances. Reverse engineering starts with measurement, then a DFM note listing anything that must change before the part can be moulded reliably.
How is colour controlled between batches?
By masterbatch ratio, a physical sample agreed at T1, and a spectrophotometer reading at an agreed geometry. A screen colour is not a specification, and a lab dip that has never been moulded is only half a decision.
Next step
Send a drawing or a sample and the quotation comes back with the tooling assumptions exposed. The injection moulding page covers capability and materials; the production process page shows how trials and batch control run; drawings can be sent through the contact form.

